Saturday, September 28, 2013

MONITORING REPORT 
Version: 02
Date: 27/12/2006
ULTRATECH CEMENT LIMITED (UTCL) 
Optimum utilisation of clinker by production of Pozzolana Cement at 
UltraTech Cement Ltd. (UTCL), 
Andhra Pradesh. 
Reference No. UNFCCC 00000438 
Project Location 
Andhra Pradesh Cement Works 
Bhogasamudram, Tadipatri 
District: Anantpur, Andhra Pradesh – 
515415, India 

 Arakkonam Cement Works 
Chetteri village, PO Arakkonam 631003 
Vellore, Tamilnadu, India 
ULTRATECH CEMENT LIMITED 
UltraTech Cement Limited 
Bhogasamudram, Tadipatri 
District: Anantpur, Andhra Pradesh – 
515415, India 
Tel: 91-8558-288801 
Fax: 91-8558-288821/31 
www.adityabirla.com2 
SECTION- I: INTRODUCTION 
I.1: Project Description 
UltraTech Cement Limited has five integrated cement plants one among is Andhra Pradesh 
Cement Works (APCW), which has as an installed capacity of 2.3 Million Tonnes per annum. 
Andhra Pradesh Cement Works (APCW) is situated in Tadipatri, Andhra Pradesh. This plant 
has one grinding unit installed in Arakkonam, Tamilnadu. This is a grinding unit which 
produces mainly Portland Pozzolana Cement (PPC) with the clinker supplied by UltraTech 
Cement Limited Tadipatri. 
The project activity entails a reduction of the clinker content by producing the Portland 
Pozzolana cement (PPC), thereby replacing an equivalent amount of clinker at UTCL’s 
cement manufacturing units at Tadipatri, Andhra Pradesh & Arakkonam, Tamilnadu.
I.2: Current Status of the Project Activity 
The project activity started in phased manner with the increasing additives percentage in the 
PPC. The project is operating in a successful manner since 1st April 2000. 
The project activity has been registered with UNFCCC as CDM activity1
 under sectoral 
scope 4 - Manufacturing Industries as per the sectoral scopes related approved 
methodologies and Designated Operational Entities (DOE) (version 19 Sep 05, 15:57).The 
UNFCCC reference number for the project activity is 00000438. 
I.3: Baseline Methodology Adopted 
TITLE: Consolidated Baseline methodology for increasing the Blend in cement 
production (ACM0005 VER 02) 
Reference: UNFCCC website 
1
http://cdm.unfccc.int/Projects/DB/DNV-CUK1148386358.08/view.html3 
Section- II: Monitoring 
II.1: Monitoring Methodology 
TITLE: Consolidated monitoring methodology for increasing the Blend in cement 
production (ACM0005-ver02) 
II.2: Monitoring Period 
Monitoring period for the project activity is chosen from 01/04/2000 -31/03/2006 (Both days 
included). Parameters monitored during the period and their recording frequency is given in 
the ensuing paragraph. Data has been archived for verification purpose. 
II.3: Monitoring Parameters 
II.3.1: Data Monitored for Project Emission Calculations 
ID 
no 
Data variable Data unit Recording 
Frequency 
Comments 
1.1 InCao y % Daily Estimated from lab 
experiment of average 
daily sample. 
Instrument: X-ray 
Analyzer 
Procedure: As per ISO 
9001 
1.2 OutCao y % Daily Estimated from lab 
experiment of average 
daily sample. 
Instrument: X-ray 
Analyzer 
Procedure: As per ISO 
9001 
1.3 InMgo y % Daily Estimated from lab 
experiment of average 
daily sample. 
Instrument: X-ray 
Analyzer 
Procedure: As per ISO 
9001 
1.4 OutMgo y % Daily Estimated from lab 
experiment of average 4 
ID 
no 
Data variable Data unit Recording 
Frequency 
Comments 
daily sample. 
Instrument: X-ray 
Analyzer 
Procedure: As per ISO 
9001 
1.5 Quantity of clinker 
raw material 
Kilo Tonnes Annually Measured from Silo level 
(Silo rope) and 
crosschecked from 
physical verification. 
1.6 CLNKy Kilo Tonnes of 
clinker 
Annually Kiln feed is measured 
from weigh bridge. 
Clinker quantity is 
calculated from of kiln 
feed to kiln feed to clinker 
conversion factor. 
Crosschecked from 
physical verification. 
1.7 FFi_y tonnes of fuel i Annually Instrument: Weigh bridge 
Accuracy: +/- 2% 
Calibration: As per ISO 
procedure 
1.8 EFFi
 tCO2/tonne of 
fuel i 
Annually IPCC default values 
Uncertainty: Low 
1.9 PELE grid_CLNK,y MWh Monthly Instrument: Electrical 
meter 
Accuracy: +/- 1% 
Calibration: Internal 
procedure 
1.10 EF grid_BSL tCO2/MWh Annually Calculated in the baseline 
and validated by 
validation DOE. 
1.11 PELE sg_CLNK,y MWh Monthly Instrument: Electrical 
meter 
Accuracy: +/- 1% 
Calibration: Internal 
procedure 
1.12 EF sg_y tCO2/MWh Monthly Calculated from the 
quantity of fuel consumed 
in power plant and the 
quantity of fuel used. 5 
ID 
no 
Data variable Data unit Recording 
Frequency 
Comments 
1.13 ADD,y Quantity of 
additives 
Kilo Tonnes Monthly Instrument: Weigh bridge 
Accuracy: +/- 2% 
Calibration: As per ISO 
procedure 
1.14 PELE grid_BC,y MWh Monthly Instrument: Electrical 
meter 
Accuracy: +/- 1% 
Calibration: Internal 
procedure 
1.15 PELE sg_BC,y MWh Monthly Instrument: Electrical 
meter 
Accuracy: +/- 1% 
Calibration: Internal 
procedure 
1.16 PELE grid_ADD, MWh Monthly Instrument: Electrical 
meter 
Accuracy: +/- 1% 
Calibration: Internal 
procedure 
1.17 PELE sg_ADD,BS L MWh Monthly Instrument: Electrical 
meter 
Accuracy: +/- 1% 
Calibration: Internal 
procedure 
1.18 Fi,j,y Tones of fuel i Monthly Instrument: Weigh bridge 
Accuracy: +/- 2% 
Calibration: As per ISO 
procedure 
1.19 COEF I,j,,y tCO2/tonne of 
fuel i 
Annually IPCC default factors 
1.20 GEN I,y MWh Annually Instrument: Electrical 
meter 
Accuracy: +/- 2% 
Calibration: Internal 
procedure 
1.21 PE calcin,y tCO2/tonne of 
clinker 
Annually Calculated from the 
formulae provided in 
methodology 
1.22 PE fossil_fuel,y tCO2/tonne of 
clinker 
Annually Calculated from the 
formulae provided in 6 
ID 
no 
Data variable Data unit Recording 
Frequency 
Comments 
methodology 
1.23 PE ele_grid_CLNK,y tCO2/tonne of 
clinker 
Annually Calculated from the 
formulae provided in 
methodology 
1.24 PE ele_sg_CLNK,y tCO2/tonne of 
clinker 
Annually Calculated from the 
formula given in 
methodology
1.25 PE ele_grid_BC,y tCO2/tonne of 
blended 
cement 
Annually Calculated from the 
formula given in 
methodology
1.26 PE ele_sg_BC,y tCO2/tonne of 
blended 
cement 
Annually Calculated from the 
formula given in 
methodology
1.27 PE ele_grid_ADD,y tCO2/tonne of 
blended 
cement 
Annually Calculated from the 
formula given in 
methodology
1.28 PE ele_sg_ADD,y tCO2/tonne of 
blended 
cement 
Annually Calculated from the 
formula given in 
methodology
1.29 PE blend,y tCO2/tonne of 
blended 
cement 
Annually Calculated from the 
formula given in 
methodology
II.3.2: Data Monitored for Leakage Calculations 
ID 
no 
Data variable Data unit Recording 
Frequency 
Comments 
3.1 Fuel consumption 
for the vehicle per 
kilometre 
Kg of 
fuel/Kilometer 
Annually The actual values 
recorded from 
transporters. 
3.2 Distance between 
the source of 
additive and project 
activity plant 
Km Per Trip The sources of fly ash are 
fixed and distances are 
taken from actual truck 
transport. 
3.3 Quantity of additive 
carried in one trip 
per vehicle 
Tonnes of 
addtive/ 
vehicle 
Per Trip Instrument: Weigh bridge 
Accuracy: +/- 2% 
Calibration: As per ISO 
procedure 
3.4 Emission factor for 
transport fuel 
Kg CO2/Kg of 
fuel 
Annually IPCC values are used. 7 
3.5 Electricity 
consumption for 
conveyor system for 
additives 
MWh Monthly Not applicable
3.6 Grid electricity 
emission factor 
tonnes of 
CO2/MWh 
Annually Not applicable
3.7 Tonnes of additives 
in year y / total 
additional additives 
used in year 
Tonnes of fly 
ash 
Annually The flyash availability 
records.
II.3.3: Quality Assurance (QA)/ Quality Control (QC) Plan 
Quality assurance/quality control plan was made as per ISO guidelines. Monitoring was done 
with necessary equipments on intervals mentioned in the methodology adopted for the project 
activity. The calibration of monitoring equipment is being maintained as per the ISO 
requirement and the same is being done regularly. All monitoring parameters being recorded 
and the same being verified by the responsible authorities mentioned in procedure. 
II. 3.4: Environmental Management Plan 
In general, the environmental monitoring activities (like stack emissions, ambient air quality 
for Suspended Particulate Matter etc.,) is carried out in the plant as per the guidelines 
provided by Pollution Control Board (PCB). The compliance report of environmental 
condition of the plant is submitted monthly to PCB and environmental statement of the plant 
is submitted to PCB on annual basis. 8 
Section-III: GHG Emission Reduction 
Emission reduction achieved during monitoring period covered in the report has been 
presented in the following table. 
Formula for emission reduction calculation 
2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 Total 
3652 16891 30890 28105 14174 10892 104603 
ERy = { [BEBC,y – PEBC,y] * BCy + Ly } * (1 – αy)Appendix-1 
Baseline Emissions
Parameter Unit 1999-00 
Baseline Emissions of CO2 per tonne of clinker in the project activity (tCO2/tonne clinker)-BE clinker
Baseline Emissions per tonne of clinker due to calcinations of calcium carbonate and magnesium carbonate (tCO2/tonne clinker)- BE calcin 
Quantity of raw mix Tonnes 3315746 
Quantity of clinker produced Tonnes 2200230 
CaO content (%) of raw mix % 0 
MgO content (%) of raw mix % 0 
CaO content (%) of Clinker % 64.59 
MgO content (%) of Clinker % 0.918 
Baseline Emissions from the calcinations of 
limestone(tCO2/tonne clinker) BE calcin tCO2/tclinker 0.51706 
Baseline Emissions per tonne of clinker due to combustion of fossil fuels for clinker production (tCO2/tonne clinker)-BE fossil_fuel 
Quantity of coal consumed-FF_,BSL Tonnes 281056.20 
Net calorific value of coal Fuel(IPCC) TJ/KiloTonnes 24.41 
Carbon Emission factor of coal(IPCC) tCO2/TJ 96.07 
Emission factor of coal - EFF 
tCO2/Ton of 
fuel 2.34 
Baseline Emissions per tonne of clinker due to combustion of 
fossil fuels for clinker production-BE fossil_fuel
tCO2/tclinker 0.299499 
Baseline grid electricity emissions for clinker production per tonnne of clinker- BE ele_grid_CLNK -(tCO2/tonne clinker) 
Baseline grid electricity for clinker production -
BELEgrid_CLNK MWh 5554.46 
Baseline grid emission Factor for state grid - EFgrid_BSL tCO2/MWh 0.8345 
Baseline grid electricity emissions for clinker production 
per tonnne of clinker BE ele_grid_CLNK
tCO2/tonne 
clinker 0.002107 
Baseline APGPCL electricity for clinker production -
BELEapgpcl_CLNK MWh 49321.43 10 
Baseline APGPCL emission Factor - EFapgpcl_BSL tCO2/MWh 0.583 
Baseline APGPCL electricity emissions for clinker 
production per tonnne of clinker BE ele_apgpcl_CLNK
tCO2/tonne 
clinker 0.013069 
Baseline Emissions from Self generated electricity for clinker production per tonne of clinker -BE ele_sg_CLNK-(tCO2/tonne clinker) 
Baseline generation of Electricity by DG sets for clinker 
production -BELEsg_CLNK_DG MWh 81597.35 
DG set Emission Factor in year y - EFsg_DG_BSL tCO2/MWh 0.64 
Self generated electricity emissions for clinker 
production per tonnne of clinker BE ele_sg_CLNK,y 
tCO2/tonne of 
clinker 0.023735 
Baseline Emissions of CO2 per tonne of clinker in 
the project activity (tCO2/tonne clinker)-BE clinker
tCO2/tonne of 
clinker 0.855465 
Baseline Electricity Emissions for BC grinding and preparation of additives (tCO2/tonne BC)-BE ele_ADD_BC
Annual production of BC in base year -BCBSL
kilotonnes of 
BC 194.238 
Baseline grid electricity emissions for BC grinding in BE ele_grid_BC -(tCO2/tonne of BC) 
Baseline Grid Electricity for grinding BC -BELEgrid_BC MWh 228.43
Baseline Grid Emission Factor for state grid - 
EFgrid_BSL tCO2/MWh 0.8345
Baseline Grid electricity emissions for BC grinding 
(tCO2/tonne of BC) BE ele_grid_BC
tCO2/tonne of 
BC 0.000981389
Baseline APGPCL Electricity for grinding BC -
BELEapgpcl_BC MWh 2055.82
Baseline APGPCL Emission Factor for apgpcl grid - 
EFapgpcl_BSL tCO2/MWh 0.583
Baseline APGPCL electricity emissions for BC grinding 
(tCO2/tonne of BC) BE ele_apgpcl_BC
tCO2/tonne of 
BC 0.006170488
Baseline self generated electricity emissions for BC grinding BE ele_sg_BC 
Baseline generation of Electricity by DG sets for BC 
grinding -BELEsg_DG_BC MWh 3426.3611 
Baseline Self generated electricity emissions for BC 
grinding (tCO2/tonne of BC) BE ele_sg_BC
tCO2/tonne of 
BC 0.0112896
Baseline Grid electricity emissions for additive preparation BE ele_grid_ADD 
Baseline grid electricity emissions for additive 
preparation BE ele_grid_ADD
tCO2/tonne of 
BC 0
Baseline emissions from Self generated electricity additive preparation BE ele_sg_ADD 
Emissions from Self generated electricity additive 
preparation BE ele_sg_ADD
tCO2 / tonne of 
BC 0
Baseline electricity Emissions for BC grinding and 
preparation of additives BE ele_ADD_BC
tCO2 / tonne of 
BC 
0.018441512 
Project Emissions
Parameter Unit 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 
Emissions of CO2 per tonne of clinker in the project activity plant (tCO2/tonne clinker)-PE clinker,y
Emissions per tonne of clinker due to calcinations of calcium carbonate and magnesium carbonate in year y (tCO2/tonne clinker)- PE calcin,y 
Quantity of raw mix consumption Tonnes 3247974 2710865 3553619 3316163 3339869 3470369 
Quantity of clinker produced Tonnes 2140235 1786310 2356155 2200070 2215800 2304560 
CaO content (%) of raw mix % 0 0 0 0 0 0 
MgO content (%) of raw mix % 0 0 0 0 0 0 
CaO content (%) of Clinker % 64.44 64.02 63.99 63.58 63.18 63.49 
MgO content (%) of Clinker % 0.93 0.78 0.94 0.97 0.97 0.96 
Emissions from the calcinations of limestone(tCO2/tonne 
clinker) PE calcin,y tCO2/tclinker 0.51601 0.51107 0.51259 0.50970 0.50656 0.50888 
Emissions per tonne of clinker due to combustion of fossil fuels for clinker production in year y (tCO2/tonne clinker)-PE fossil_fuel,y 
Quantity of coal consumed-FF_,y Tonnes 280424.11 261332.68 356262.31 328680.03 325768.28 350140.99 
Net calorific value of coal Fuel(IPCC) TJ/KiloTonnes 24.31 21.88 20.44 20.19 22.06 20.48 
Carbon Emission factor of coal(IPCC) tCO2/TJ 96.07 96.07 96.07 96.07 96.07 96.07 
Emission factor of coal - EFF 
tCO2/Ton of 
fuel 2.34 2.10 1.96 1.94 2.12 1.97 
Emissions per tonne of clinker due to combustion of fossil 
fuels for clinker production-PE fossil_fuel,y tCO2/tclinker 0.306022 0.307453 0.296910 0.289752 0.311515 0.298891 
Grid electricity emissions for clinker production per tonnne of clinker in year y - PE ele_grid_CLNK, y (tCO2/tonne clinker) 
Grid Electricity for clinker production in year y -
PELEgrid_CLNK,y MWh 4270.71 8651.93 9302.03 30856.86 65019.96 91809.37 
Grid Emission Factor in year y- EFgrid_y tCO2/MWh 0.8345 0.8345 0.8345 0.8345 0.8345 0.8345 
Grid electricity emissions for clinker production per tonnne 
of clinker PE ele_grid_CLNK,y
tCO2/tonne 
clinker 0.001665 0.004042 0.003295 0.011704 0.024487 0.033245 
APGPCL Electricity for clinker production in year y -
PELEapgpcl_CLNK,y MWh 85675.45 64344.61 78845.51 47401.09 51302.40 43998.35 
APGPCL Emission Factor in year y- EFapgpcl_y tCO2/MWh 0.583 0.583 0.583 0.583 0.583 0.583 13 
APGPCL electricity emissions for clinker production per 
tonnne of clinker PE ele_apgpcl_CLNK,y
tCO2/tonne 
clinker 0.023338 0.021000 0.019509 0.012561 0.013498 0.011131 
Emissions from self generated electricity per tonne of clinker production in year y -PE ele_sg_CLNK,y-(tCO2/tonne clinker)
Generation of Electricity by DG sets for clinker production in 
year y-PELEsg_CLNK_DG,y MWh 48976.50 45793.07 46624.53 42635.90 5546.64 0.00 
DG set Emission Factor in year y - EFsg_DG_y tCO2/MWh 0.67 0.65 0.65 0.64 0.65 0.65 
Self generated electricity emissions for clinker production per 
tonnne of clinker PE ele_sg_CLNK,y
tCO2/tonne of 
clinker 0.015239 0.016576 0.012887 0.012486 0.001625 0.000000 
Emissions of CO2 per tonne of clinker in the project activity in 
year y (tCO2/tonne clinker)-PE clinker,y
tCO2/tonne of 
clinker 0.862274 0.860146 0.845187 0.836198 0.857680 0.852147 
Electricity Emissions for BC grinding and preparation of additives in year y (tCO2/tonne BC)-PE ele_ADD_BC,y
Annual production of BC in year y -BCy kilotonnes of BC 487.46748 875.3367 956.88085 716.8872 662.3782 748.31003 
Grid electricity emissions for BC grinding in a year y PE ele_grid_BC,y -(tCO2/tonne of BC)
Southern Grid Electricity for grinding BC in year y -
PELEapgrid_BC,y (AP) MWh 396.63 950.13 683.18 871.39 1473.06 2679.02 
Southern Grid Emission Factor in year y- EFapgrid_y (AP) tCO2/MWh 0.8345 0.8345 0.8345 0.8345 0.8345 0.8345 
Regional grid electricity emissions for BC grinding in year y 
(tCO2/tonne of BC) PE ele_apgrid_BC,y
tCO2/tonne of 
BC 0.000679 0.000906 0.000596 0.001014 0.001856 0.002988 
APGPCL Electricity for grinding BC in year y -
PELEapgpcl_BC,y MWh 7956.77 7066.18 5790.73 1338.59 1162.28 1283.88 
APGPCL Emission Factor in year y- EFapgpcl_y tCO2/MWh 0.583 0.583 0.583 0.583 0.583 0.583 
APGPCL electricity emissions for BC grinding in year y 
(tCO2/tonne of BC) PE ele_apgpcl_BC,y
tCO2/tonne of 
BC 0.009516 0.004706 0.003528 0.001089 0.001023 0.001000 
Southern Grid Electricity for grinding BC in year y -
PELEtngrid_BC,y (TN) MWh 3527.92 9965.88 1567.60 3138.83 1703.34 5089.03 
Southern Grid Emission Factor in year y- EFtngrid_y (TN) tCO2/MWh 0.8345 0.8345 0.8345 0.8345 0.8345 0.8345 
Regional grid electricity emissions for BC grinding in year y 
(tCO2/tonne of BC) PE ele_tngrid_BC,y
tCO2/tonne of 
BC 0.006 0.010 0.001 0.004 0.002 0.006 
Emissions from self generated electricity for BC grinding in year y PE ele_sg_BC,y
Generation of Electricity by DG sets for BC grinding in year 
y-PELEsg_BC,y MWh 4548.50 11400.52 19026.47 15899.47 16322.76 15084.75 
Self generated electricity emissions for BC grinding in year y 
(tCO2/tonne of BC) PE ele_sg_BC,y tCO2/tonne of BC 0.006214 0.008422 0.012949 0.014289 0.015994 0.013084 14 
Grid electricity emissions for additive preparation in year y PE ele_grid_ADD,y
Grid electricity emissions for additive preparation in year y 
PE ele_grid_ADD,y 
tCO2/tonne of 
BC 0.00 0.00 0.00 0.00 0.00 0.00 
Emissions from Self generated electricity additive preparation in year y PE ele_sg_ADD,y
Emissions from Self generated electricity additive preparation in 
year y PE ele_sg_ADD,y
tCO2 / tonne of 
BC 0 0 0 0 0 0 
Electricity Emissions for BC grinding and preparation 
of additives in year y PE ele_ADD_BC,y 
tCO2 / tonne of 
BC 0.022448 0.023535 0.018440 0.020046 0.021019 0.022747 15 
Leakages
Parameter Unit 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 
Quantity of Flyash procured from 
Rayalseema Thermal power 
plant (APCW) 
Tonnes 
36551 48643 57392 20730 22776 23180
Quantity of Flyash procured from 
North chennai thermal power 
station (APCW) 
Tonnes 
5555 4349 14 0 351 1069
Quantity of Flyash procured from 
TCP limited (APCW) 
Tonnes 
0 1147 0 0 0 0
Quantity of Flyash procured from 
Vijayawada Thermal power plant 
(APCW) 
Tonnes 
6224 3552 3164 0 0 0
Quantity of Flyash procured from 
Nellore Thermal power plant 
(APCW) 
Tonnes 
6508 7478 9619 0 0 0
Quantity of Flyash procured from 
Jindal (APCW) 
Tonnes 
29824 18505 2618 0 0 0
Quantity of Flyash procured from 
Raichur Thermal power plant 
(APCW) 
Tonnes 
2483 1975 0 0 0 0
Quantity of Flyash procured from 
Rayalseema Thermal power 
plant (ARCW) 
Tonnes 
0 0 37 80 16 68
Quantity of Flyash procured from 
North chennai thermal power 
station (ARCW) 
Tonnes 
5854 69450 135090 139756 122001 33002
Quantity of Flyash procured from 
Veetech (ARCW) 
Tonnes 
0 0 0 0 0 106096
Quantity of Flyash procured from 
TCP limited (ARCW) 
Tonnes 
1941 26063 0 0 0 016 
Total quantity of Fly ash 
procured Tonnes 94940 181163 207934 160566 145143 163416 
Fuel consumption for the Vehicle 
per kilometre-TFcons
kg of fuel/ kilometre 
0.4545 0.4545 0.4545 0.4545 0.4545 0.4545 
Distance between the source of 
additive(Rayalseema thermal 
power plant)and the project 
activity plant-Dadd_source (APCW)
 kilometre 110 110 110 110 110 110 
Distance between the source of 
additive(North chennai thermal 
power station)and the project 
activity plant-Dadd_source (APCW)
 kilometre 425 425 425 425 425 425 
Distance between the source of 
additive(TCP limited) and the 
project activity plant-Dadd_source 
(APCW)
kilometers 425 425 425 425 425 425 
Distance between the source of 
additive(Vijayawada thermal 
power plant)and the project 
activity plant-Dadd_source (APCW)
 kilometre 480 480 480 480 480 480 
Distance between the source of 
additive(Nellore thermal power 
plant)and the project activity 
plant-Dadd_source (APCW)
 kilometre 265 265 265 265 265 265 
Distance between the source of 
additive(Jindal)and the project 
activity plant-Dadd_source (APCW)
 kilometre 171 171 171 171 171 171 17 
Distance between the source of 
additive(Raichur thermal power 
plant)and the project activity 
plant-Dadd_source (APCW)
 kilometre 325 325 325 325 325 325 
Distance between the source of 
additive(Rayalseema thermal 
power plant)and the project 
activity plant-Dadd_source (ARCW)
 kilometre 284 284 284 284 284 284 
Distance between the source of 
additive(North chennai thermal 
power station)and the project 
activity plant-Dadd_source (ARCW)
 kilometre 124 124 124 124 124 124 
Distance between the source of 
additive Veetech-Dadd_source 
(ARCW)
 kilometre 124 124 124 124 124 124 
Distance between the source of 
additive TCP limitedDadd_source 
(ARCW)
 kilometre 136 136 136 136 136 136 
Net calorific value of Diesel 
Fuel(IPCC) TJ/KiloTonnes 43.33 43.33 43.33 43.33 43.33 43.33 
Carbon Emission factor of 
Diesel fuel (IPCC) tCO2/TJ 74.07 74.07 74.07 74.07 74.07 74.07 
Emission factor for transport 
fuel(Diesel)-TEF 
kg CO2/ kg of fuel 3.21 3.21 3.21 3.21 3.21 3.21 
Electricity consumption for the 
conveyor system for additivesELEconveyor_ADD
MWh 0.00 0.00 0.00 0.00 0.00 0.00 

No comments: